My 1st Frame up Build
by Barry (bear) Reever
(Ohio)
Rigid Frame Chopper Build
I started building this bike in March 2009. Just about finished and proud as hell.
Chopper Guys Rigid frame 1 3/4" backbone stretch, 35 degree rake, axle plates raised 1/2". 1998 Evo 80" engine, 5 spd Tranny, 170 rear tire, 3" open belt primary, FL front forks (may replace with 8 over girder). Forward controls, Front end & frame Gloss black, tanks & fenders satin black. In the process of wiring. All work (everything) was done by me. I guess that's why I'm as proud as I am. Hope you like her. I'll try to send more pictures when she is complete. This is a picture I took to see how she was going to look, took the tanks, fenders, seat back off to start wiring.